Signals Needed when Transporting a Board on MPM Machines Brian Nolan Modified on: Wed, 18 Nov, 2020 at 11:05 AM See the attached PowerPoint which lists the sequence of operation and inputs/outputs for the conveyor system. SMEMA Transfer Sequence.pptx (121 KB)